Bloomberg
A joint venture in Japan has scrapped plans for a coal-fired power plant, leaving the country with no new construction on the horizon as companies drop the dirty fuel amid tighter emissions rules and strong growth outlook for renewables.
Kansai Electric Power Co and Marubeni Corp won’t move forward with a 1.3 gigawatt coal power project in Akita prefecture that was slated to begin operations in 2024, a unit of Kansai Electric said.
The firms decided to cancel the project due to the government’s tighter environmental rules and banks curbing financing for carbon-intensive projects, the Nikkei reported ahead of the announcement. The companies are considering building a cleaner biomass facility instead, the Nikkei said.
While there are still several coal projects currently under construction, Japan has no plans for additional new plants, according to BloombergNEF.
A 1.2 gigawatt coal project in Yamaguchi prefecture was
also canned as electricity demand was expected to remain flat, while renewable energy
expands. Japan won’t build any new coal plants due to “lowering power demand, tighter environmental regulations and additional costs to comply with ‘efficient’ and ‘clean’ coal projects,†Olympe Mattei, an analyst at BloombergNEF, said by email.
The cancellation comes after Japan said it would reduce its greenhouse gas emissions by 46% by 2030 compared with 2013, strengthening a previous commitment under the Paris Agreement. Tokyo decided last year to shut about 100 inefficient coal-fired power units by 2030, while PM Yoshihide Suga pledged in October for the nation to become carbon-neutral by 2050.